Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13756013

- Product Categories
- Friendly Links
Information Name: | Acrylic Badminton Basketball Volleyball Tennis Tak sports |
Published: | 2015-05-18 |
Validity: | 30000 |
Specifications: | |
Quantity: | 8888888.00 |
Price Description: | |
Detailed Product Description: | Acrylic court surface (including sand: 2 times) Materials: colored acrylic stadium special fabric, quartz sand (120-140 mesh), water; ratio: 1kg (fabric): 0.9 (quartz sand): 0.6kg (water) ; Construction: stirring with an electric mixer evenly into the construction site, with special tools are half the slurry scraping on the concrete floor, note: color distribution should be uniform; acrylic court surface layer (finishing layer: 1 pass) Material: Color acrylic stadium special fabric, water; ratio: 1kg (fabric): 0.8kg (water); construction: stirring with an electric mixer evenly into the construction site, with special tools are half the slurry scraping on the concrete floor, note: color should be evenly distributed; and (3) crossed: the boundary position measurement calibration, water-based acrylic paint line dedicated scribe. (4) Finishing clearance. 5, the construction schedule (every rain postponed): 6, quality assurance measures of the quality of the project objectives to achieve excellent project management and in line with national standards. Seriously implement the project technical specifications related to a strong quality assurance system to ensure good works. 1 technology to ensure project quality: (1) According to the engineering characteristics and the actual site, compiled a good construction design, technical measures to ensure project quality, and conscientiously implement checks. (2) The Commissioner in charge of people each technical tests, arrangements for staff. Mechanical deployment. 2 approach carefully check the raw materials, and has a single factory warranty and inspection reports. 3 Note that due to the construction days, due to natural climatic factors affecting the quality of the project must take time because of effective measures to strengthen prevention. 7, safe and civilized construction measures for the strict implementation of safety production of six 1 discipline. 2 spot electricity have a professional electrician, using a standard electrical boxes, electrical engineering to achieve an electric gate. 3 Strengthening security inspections, construction machinery to achieve safe operation. 4 team stand set construction safety responsibility system, accountable, transfer inspection, found hidden and disappointed eliminated. Material 5 within the construction area, mechanical stacked neatly. 6 construction waste is prohibited misplacing, centralized accumulation, timely Sinotrans. 7 active listening school proposal, prompting the construction of civilization. 8 Xianzarenyuan prohibited to enter the construction site, establish a management system, and out the door to be recorded. |
Admin>>>
You are the 5189 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Tak sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5189 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Tak sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility