Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13756013

- Product Categories
- Friendly Links
Information Name: | Elastic acrylic stadium construction material Tak sports venues |
Published: | 2015-05-18 |
Validity: | 30000 |
Specifications: | |
Quantity: | 8888888.00 |
Price Description: | |
Detailed Product Description: | Plastic material padded and acrylic coated system, a thickness of about 3-4mm. Hundred percent inorganic fibers containing pigments, laying rinse has good value and drainage slope concrete or asphalt ground-based (1:: 100-1 150 within) on. Features: can effectively cover minor cracks in the ground-based, greatly reducing maintenance costs. It has excellent damping performance, acrylic coating to the foot cushion to provide adequate load bearing capacity, reduce the damage generally hard on the feet may arise. Ball rebound moderate balanced, does not affect the ball's bounce angle. Bright color, a variety of colors to choose from. For a variety of climatic conditions, resistance to ultraviolet radiation, lasting color does not fade. Even with the high rate of commercial space, coated in 5 - also without resurfaced 10 years. Flexible Acrylic Features: 1, a very competitive price; 2, using high-quality acrylic latex raw material, colorful, bright color, and have high resistance to ultraviolet light, so in the long-term exposure can also be maintained under color; 3, water-based raw materials, non-toxic, 100% green products; 4, weather resistance, not aging, long life, light is good, deep color, color lasting subside; 5, smooth surface makes the ball easier to play on, but does not change the ball bounce angle; 6, and excellent wear resistance, slip resistance, not easy to powder; 7, good elasticity, easy to crack, with a comfortable sense of movement; resilient shock absorbing cushion series performance, athletes foot and leg can reduce volatility; 8, strong adhesion, combined with a solid, no delamination, no bubbling. 9, smooth surface, easy to clean, durable and strong, routine maintenance convenience, low cost. Elastic acrylic construction program: Tak (elastic acrylic SPA) stadium construction process --- a concrete, Construction conditions: temperature: not less than 10 ℃, the surface temperature of not higher than 45 ℃; Humidity: Relative humidity less than 85 %; grade: not less than 3: 1000, not more than 5: 1000; Flatness: height not exceeding three meters straightedge 3mm; strength: C25 must reach above ground strength; Second, construction tools: a, hand grinding cutting machine a. (Cutting temperature seam) b, a mixer, a stirred vessel, scraper. (Course material placement) c, a knife, a small gray knife, portable grinding machine. (Resurfacing) d, tape, canvas line, brush, textured paper scribing tool. e, broom, floor mops, water and other cleaning tools. Third, the base surface: smooth (3M ruler error 3mm), strong and solid, no loose floats, clean clean, cutting reasonable temperature seam, four steps of: Surface treatment - grinding or pickling venue - primed caulk? - fill the water - Scraping the elastic layer - Scraping reinforcement layer - Scraping the surface layer - scrape spray curing agent - dash - clearance completed. Fifth, the construction method: 1, :( pickling or sanding) with water wet ground, with about 8% of dilute hydrochloric acid to clean the floor, then rinse with clean water. 2, primer: primer evenly with NALSANE roll to the basal plane, the amount depending on processing farm firmness, generally an amount of about 0.2kg / m2, the next step can be dry solid construction. 3, caulk: to be cured primer compressible foam light hair pressed into seam temperature, make sure the temperature does not protrude fill seal seam; stitch in temperature and irregular V-shaped slit responsibility after reprocessing with sealant proportional mixing well, divided into two to three times a knife in the seam 4, fill water: 80-100 mesh sand against the use NALSANET M-300 (cement leveling material) (1; 1) Stir leveling stagnant water, 30 minutes after leveling requires rain water does not exceed 3mm is qualified. 5, scratch screed: 80-100 mesh sand against the leveling material with M-300 (cement leveling material); After stirring the audience with a knife scraping rake (1). 6. Scraping elastic layer: with NALSANE SPA-M1 (elastic material) :( 325) cement = 1: 0.5 (adjusted construction consistency can add water) to the flat blade knife to the base, and each thickness can not scratch more than 1-2mm, every time before scraping a dry solid whichever interval (typically about eight hours, depending on the scene weather conditions) until the knife to the desired thickness shall prevail. 7, after the elastic layer coating to dry, with the water method to test the flatness of the ground, the water at the required NALSANET SPA -M2 (elastic reinforcing material) plus (No. 325) cement fill level, with a rough surface portion after finishing mill Scraping reinforcing layer. 8. Scraping screed: with NALSANE M-300 (cement leveling material): sand = 1: 0.5 to 0.8 (can be adjusted with water construction consistency) with a flat blade knife, smooth surface requirements after scratch. 9, Scraping the surface layer: Press NALSANE SPA- S: special sand = 1: 0.3 full mixing evenly applied to strengthen the surface, generally scratch three (third without sand, usually with about 0.65kg / m2 ). 10, the applicator UV curing agent (G-3000). A, with a curing agent of 1: 1 or 1.5 versus tap water, stir; B, knife with plastic rake uniform or sprayer to spray evenly to the audience. 11, line: standard size measurement location, with a canvas line marked line position, and then along the canvas with masking line attached to the court, even with NALSANE special marking paint with a hair brush in the two Masking Room until the paint is dry to the Masking tear. 12, completed the clearance. Elastic acrylic stadium Note: 1, the new concrete cured to site maintenance required after the completion of the laying of construction. 2, before the end of material brushing, ensure that the ground dry. ; 3, not construction rainy day, avoid the sun or the temperature is greater than 90% with construction. 4, to be kept for more than seven days to completion of the operation after the laying of the venue. 5, blue, network, row, feathers, golf course material of choice. |
Admin>>>
You are the 5189 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Tak sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5189 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Tak sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility